JENEPONTO 2 2x125MW THERMAL POWER PLANT

Slipforming

JENEPONTO 2 2x125MW THERMAL POWER PLANT

Liner installation

JENEPONTO 2 2x125MW THERMAL POWER PLANT

Inside chimney

JENEPONTO 2 2x125MW THERMAL POWER PLANT

Powerplant view

The Company has been choosen in November 2015 by PT D&C ENGINEERING COMPANY China to build a 150m height reinforced concrete chimney with 1 internal steel liner D=5.00m for the JENEPONTO 2 2x125 MW Coal Fired Steam Power Plant in South Sulawesi Province, Indonesia.
The engineering and procurement activities already started, and piling foundation have already been completed on site.
Construction activities has been planned to be completed within August 2017.

The scope of work included:

  • Structural and detail engineering design of windshield and piling foundation
  • R.C. Windshield slipforming
  • Steel platform assembling and lifting
  • Steel liners assembling and lifting
  • Electrical and lightning system installation
  • Ancilarry items installation