SHUQAIQ STEAM POWER PLANT

General Layout

SHUQAIQ STEAM POWER PLANT

General Layout

The Company has been choosen by Hyundai Heavy Industries Co.,Ltd. to build No.1 180m height reinforced concrete multiflue chimneys with 2 steel liners ID.6500mm for the SHUQAIQ STEAM POWER PLANT 2x640MW in Kingdom of Saudi Arabia.

The scope of work included:

  • Structural and detail engineering design
  • R.C. Windshield slipforming
  • Steel platform assembling and lifting
  • Steel liners assembling and lifting including borosilicate blocks antiacid protection
  • Electrical and lightning system installation
  • Ancilarry items installation