VINH TAN 4 THERMAL POWER PROJECT

General Layout

VINH TAN 4 THERMAL POWER PROJECT

Pile cap

VINH TAN 4 THERMAL POWER PROJECT

Rebars of Foundation

VINH TAN 4 THERMAL POWER PROJECT

Slipform

VINH TAN 4 THERMAL POWER PROJECT

Power Plant

The Company has been choosen in 2014 by Consortium of Doosan-Mitsubishi-Pacific-PECC2 to build a 213.5m height reinforced concrete multiflue chimney with 2 steel liners ID.6350mm for the Vinh Tan 4 Thermal Power Project 2x600MW in Vietnam.
All activities including engineering, procurement, and construction will be performed by Chimneys and Refractories International Srl.
Piling and foundation activities started in December 2014 and the whole chimney construction is expected to be completed in early 2016.

The scope of work included:

  • Structural and detail engineering design
  • R.C. Windshield slipforming
  • Steel platform assembling and lifting
  • Steel liners assembling and lifting including borosilicate blocks antiacid protection
  • Electrical and lightning system installation
  • Ancilarry items installation