VUNG ANG 1 THERMAL POWER PLANT 2x600MW

Slipforming

VUNG ANG 1 THERMAL POWER PLANT 2x600MW

Platform lifting

VUNG ANG 1 THERMAL POWER PLANT 2x600MW

Liner lifting

VUNG ANG 1 THERMAL POWER PLANT 2x600MW

Windshield painting

VUNG ANG 1 THERMAL POWER PLANT 2x600MW

Inlet Duct

VUNG ANG 1 THERMAL POWER PLANT 2x600MW

Completion

The Company has been choosen in May 2010 by Lilama Corporation Vietnam to build a 180m height reinforced concrete multiflue chimney with 2 steel liners ID.6500mm for the 2x600 MW Vung Ang 1 Coal Fired Thermal Power Plant 2x600MW in Vung Ang, Vietnam.
All activities including engineering, procurement, and construction will be performed by Chimneys and Refractories International
Piling and foundation activities started in September 2010 and the whole chimney construction is expected to be completed within February 2012.

The scope of work included:

  • Structural and detail engineering design
  • R.C. Windshield slipforming
  • Steel platform assembling and lifting
  • Steel liners assembling and lifting including borosilicate blocks antiacid protection
  • Electrical and lightning system installation
  • Ancilarry items installation